Ridgecrest Indian Wells Valley Campus Solar Photovoltaic Field Construction Photos

Construction was completed in June of 2004. The general project design consists of 6 1/2 acres of ground mounted Sharp Electronic solar modules and a free standing concrete building that will house the inverters, distribution equipment and allows for student laboratory space. The building is sized for a 50% photovoltaic future expansion.

pic 01
thumbnail 01
Groundbreaking for the new Solar Photovoltaic Field was held on February 5, 2004. Pictured are the members of the Board of Trustees and college administration.
pic 02
thumbnail 02
View of field looking to the southeast.
pic 03
thumbnail 03
Earthwork is presently in process for the new Solar Photovoltaic Field.
pic 04
thumbnail 04
Excavation and installation for the electrical conduits to connect the photovoltaic field with the main building has commenced in the ground level fire lane of the campus.
pic 05
thumbnail 05
Preparing the land by leveling and grading.
pic 06
thumbnail 06
Installing the concrete bases that will hold the solar panels.
pic 07
thumbnail 07
Installing the concrete bases that will hold the solar panels.
pic 08
thumbnail 08
Installing the underground electrical conduits that run under the solar field.
pic 09
thumbnail 09
Installing the underground electrical conduits that run under the solar field.
pic 10
thumbnail 10
Installing the underground electrical conduits that run under the solar field.
pic 11
thumbnail 11
More photos of the underground electrical conduits that run under the solar field.
pic 12
thumbnail 12
More photos of the underground electrical conduits that run under the solar field.
pic 13
thumbnail 13
More views of the solar field. This image is looking north towards the microwave tower.
pic 14
thumbnail 14
More views of the solar field. This image shows the two groups of panels with the access drive in between.
pic 15
thumbnail 15
The solar field is drawing near to completion. Plans are underway to establish connection with the facilities to be able to start serving power.
pic 16
thumbnail 01
The solar field is drawing near to completion. Plans are underway to establish connection with the facilities to be able to start serving power.